Inspect before attachment
Photograph and map roof type, edges, soffits, vents, tiles, parapets, drains, overflows, gutters, solar equipment, wiring, HVAC, fire systems, fragile surfaces, leaks, deterioration, and every proposed attachment.
Sequence animals, systems, and work
Resolve species and occupancy first; then assign cleanup and roof, electrical, HVAC, solar, fire, facade, or structural repairs. Approve the exclusion detail before covering defects or restricting system access.
- ✓ species, nest status, and wildlife requirements
- ✓ roof condition, warranty, access, and fall-protection ownership
- ✓ opening, vent, drain, overflow, equipment, and maintenance map
- ✓ product, attachment, corrosion, wind, drainage, and movement detail
- ✓ completion inspection, documentation, maintenance, and repair triggers